Centre Point Shoppe
This project feature exterior concrete staining using Color Fuse and Poly 250.
Read More »
Papa John’s Distribution Facility
This project features an industrial flooring project for a battery room using Low Temperature Epoxy (LTE), Epoxy Novolac 900 and Polyurea 5001.
Read More »
Dodger’s Spring Training Stadium
This project features the installation of our moisture remediation system, Epoxy Moisture Stop (EMS).



